LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS
Penggantian dinding paring MP1
PIC PROYEK
Parmin
PEMBORONG
Amir
TOTAL ESTIMASI (Dibulatkan)
Rp 0
REKAPITULASI BIAYA (F.C RECAP)
Simpan Rekap
NO
DESKRIPSI PEKERJAAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
BOBOT (%)
A.
Penggantian dinding alumunium menjadi ACP
0.00%
TOTAL BIAYA KONSTRUKSI
Rp 0
100%
Over Estimate 5%
Rp 0
GRAND TOTAL
Rp 0
DIBULATKAN
Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
Simpan Progress
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
NO
DESCRIPTION
VOL
UNIT
M-13
HARIAN M-14
VOLUME
0%
AKUMULASI PROGRESS
S
S
R
K
J
S
M
HR
AK
HR
AK
%
TOT
A
Penggantian dinding alumunium menjadi ACP
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
AVERAGE / TOTAL
0.00%
0.00%
0.00%
0.00%
TOTAL PROGRESS KESELURUHAN
0.00%
TIME SCHEDULE (M-Series)
Kurva S
Simpan Schedule
NO
DESCRIPTION
BOBOT (%)
SCH
TAHUN 2026
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
1
Penggantian dinding alumunium menjadi ACP
-
Set
0.00%
SCH
REAL
TOTAL
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
TIME SCHEDULE
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PROGRESS MINGGUAN
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
AKUMULASI PROGRESS
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00%
—
0.00%
0.00%
x
100
=
0.00
%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00%
—
0.00%
0.00%
x
100
=
0.00
%
Notes:
PROGRESS
SCH
ACT
SELISIH
KETERANGAN
Mingguan
0.00%
0.00%
0.00%
Akumulasi
0.00%
0.00%
0.00%
DIBUAT
DIPERIKSA
DISETUJUI
Nama
:
Jabatan
:
Tanggal
:
Nama
:
Jabatan
:
Tanggal
:
Nama
:
Jabatan
:
Tanggal
: