LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS

Cerucuk bambu untuk turap depan Kantor Central Office

PIC PROYEK
Jamal
PEMBORONG
Rustambi
TOTAL ESTIMASI (Dibulatkan)

Rp 0

REKAPITULASI BIAYA (F.C RECAP)
NO DESKRIPSI PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
A. Pasang Cerucuk Bambu 0.00%
B. Ikat Cerucuk 0.00%
C. Pasang Jumbo bag 0.00%
TOTAL BIAYA KONSTRUKSI Rp 0100%
Over Estimate 5% Rp 0
GRAND TOTAL Rp 0
DIBULATKAN Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
NO DESCRIPTION VOL UNIT M-0 HARIAN M-1 VOLUME 0% AKUMULASI PROGRESS
SSRKJSM HR AK HR AK % TOT
A Pasang Cerucuk Bambu 0.00% 0.00%
B Ikat Cerucuk 0.00% 0.00%
C Pasang Jumbo bag 0.00% 0.00%
AVERAGE / TOTAL 0.00%
TOTAL PROGRESS KESELURUHAN 0.00%
TIME SCHEDULE (M-Series)
NO DESCRIPTION BOBOT (%) SCH TAHUN 2026
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15
1
Pasang Cerucuk Bambu
-
0.00% SCH
REAL
2
Ikat Cerucuk
-
0.00% SCH
REAL
3
Pasang Jumbo bag
-
0.00% SCH
REAL
TOTAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIME SCHEDULE
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS MINGGUAN
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AKUMULASI PROGRESS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
PROGRESS SCH ACT SELISIH KETERANGAN
Mingguan0.00%0.00%0.00%
Akumulasi0.00%0.00%0.00%
DIBUAT DIPERIKSA DISETUJUI
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal: