LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS

Pemancangan di dolphin No 06

PIC PROYEK
Parmin
PEMBORONG
STI
TOTAL ESTIMASI (Dibulatkan)

Rp 0

REKAPITULASI BIAYA (F.C RECAP)
NO DESKRIPSI PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
A. Persiapan 0.00%
B. Pabrikasi pipa pancang 20" 0.00%
C. Pabrikasi pipa pancang 13" 0.00%
D. Pemancangan pipa 20" 0.00%
E. Pemancangan pipa 13" 0.00%
F. Fabrikasi & erection bracing 0.00%
G. Pembesian pipa 0.00%
H. Pembesian 0.00%
I. Pengecoran 0.00%
J. Pengecatan 0.00%
K. Pembobokan 0.00%
TOTAL BIAYA KONSTRUKSI Rp 0100%
Over Estimate 5% Rp 0
GRAND TOTAL Rp 0
DIBULATKAN Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
NO DESCRIPTION VOL UNIT M-1 HARIAN M-2 VOLUME 0% AKUMULASI PROGRESS
SSRKJSM HR AK HR AK % TOT
A Persiapan 0.00% 0.00%
B Pabrikasi pipa pancang 20" 0.00% 0.00%
C Pabrikasi pipa pancang 13" 0.00% 0.00%
D Pemancangan pipa 20" 0.00% 0.00%
E Pemancangan pipa 13" 0.00% 0.00%
F Fabrikasi & erection bracing 0.00% 0.00%
G Pembesian pipa 0.00% 0.00%
H Pembesian 0.00% 0.00%
I Pengecoran 0.00% 0.00%
J Pengecatan 0.00% 0.00%
K Pembobokan 0.00% 0.00%
AVERAGE / TOTAL 0.00%
TOTAL PROGRESS KESELURUHAN 0.00%
TIME SCHEDULE (M-Series)
NO DESCRIPTION BOBOT (%) SCH TAHUN 2026
M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
1
Persiapan
-
0.00% SCH
REAL
2
Pabrikasi pipa pancang 20"
-
0.00% SCH
REAL
3
Pabrikasi pipa pancang 13"
-
0.00% SCH
REAL
4
Pemancangan pipa 20"
-
0.00% SCH
REAL
5
Pemancangan pipa 13"
-
0.00% SCH
REAL
6
Fabrikasi & erection bracing
-
0.00% SCH
REAL
7
Pembesian pipa
-
0.00% SCH
REAL
8
Pembesian
-
0.00% SCH
REAL
9
Pengecoran
-
0.00% SCH
REAL
10
Pengecatan
-
0.00% SCH
REAL
11
Pembobokan
-
0.00% SCH
REAL
TOTAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIME SCHEDULE
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS MINGGUAN
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AKUMULASI PROGRESS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
PROGRESS SCH ACT SELISIH KETERANGAN
Mingguan0.00%0.00%0.00%
Akumulasi0.00%0.00%0.00%
DIBUAT DIPERIKSA DISETUJUI
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal: