LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS

Pembuatan ruang BPS

PIC PROYEK
Ismail
PEMBORONG
Suripto
TOTAL ESTIMASI (Dibulatkan)

Rp 0

REKAPITULASI BIAYA (F.C RECAP)
NO DESKRIPSI PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
A. Pekerjaan lantai 0.00%
B. Pekerjaan dinding bata 0.00%
C. Pekerjaan plaster dinding 0.00%
D. Pekerjaan ring balok 0.00%
E. Pekerjaan dinding GRC 0.00%
F. Pekerjaan atap 0.00%
G. Pekerjaan pintu 0.00%
H. Pekerjaan talang 0.00%
I. Pekerjaan finishing 0.00%
TOTAL BIAYA KONSTRUKSI Rp 0100%
Over Estimate 5% Rp 0
GRAND TOTAL Rp 0
DIBULATKAN Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
NO DESCRIPTION VOL UNIT M-16 HARIAN M-17 VOLUME 0% AKUMULASI PROGRESS
SSRKJSM HR AK HR AK % TOT
A Pekerjaan lantai 0.00% 0.00%
B Pekerjaan dinding bata 0.00% 0.00%
C Pekerjaan plaster dinding 0.00% 0.00%
D Pekerjaan ring balok 0.00% 0.00%
E Pekerjaan dinding GRC 0.00% 0.00%
F Pekerjaan atap 0.00% 0.00%
G Pekerjaan pintu 0.00% 0.00%
H Pekerjaan talang 0.00% 0.00%
I Pekerjaan finishing 0.00% 0.00%
AVERAGE / TOTAL 0.00%
TOTAL PROGRESS KESELURUHAN 0.00%
TIME SCHEDULE (M-Series)
NO DESCRIPTION BOBOT (%) SCH TAHUN 2026
M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29 M-30 M-31
1
Pekerjaan lantai
-
0.00% SCH
REAL
2
Pekerjaan dinding bata
-
0.00% SCH
REAL
3
Pekerjaan plaster dinding
-
0.00% SCH
REAL
4
Pekerjaan ring balok
-
0.00% SCH
REAL
5
Pekerjaan dinding GRC
-
0.00% SCH
REAL
6
Pekerjaan atap
-
0.00% SCH
REAL
7
Pekerjaan pintu
-
0.00% SCH
REAL
8
Pekerjaan talang
-
0.00% SCH
REAL
9
Pekerjaan finishing
-
0.00% SCH
REAL
TOTAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIME SCHEDULE
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS MINGGUAN
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AKUMULASI PROGRESS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
PROGRESS SCH ACT SELISIH KETERANGAN
Mingguan0.00%0.00%0.00%
Akumulasi0.00%0.00%0.00%
DIBUAT DIPERIKSA DISETUJUI
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal: